工地鋼筋加工棚搭建要注意什么?

來源:http://www.perthama.com/   發(fā)布時(shí)間:2022-01-11

1、工地鋼筋加工棚搭設(shè)規(guī)范:

1. Specification for erection of reinforcement processing shed on site:
鋼筋加工棚是施工現(xiàn)場(chǎng)內(nèi)對(duì)鋼筋進(jìn)行拉直、彎曲、焊接等鋼筋加工作業(yè)的一個(gè)場(chǎng)地。鋼筋加工棚的長和寬,一般會(huì)根據(jù)鋼筋加工數(shù)量和使用機(jī)械的多少確定加工棚的大小,一般情況有6*12m、9*12m、18*30m等幾種,可以根據(jù)施工實(shí)際情況,自行設(shè)計(jì)長與寬尺寸。鋼筋加工棚工作臺(tái)的布置也要合理,根據(jù)真實(shí)鋼筋加工流程來,還有加工前原材料鋼筋和加工結(jié)束后成品的存放,所以鋼筋加工棚的地面應(yīng)高于施工場(chǎng)地地面30cm,防止雨水浸泡,用腳手管進(jìn)行搭設(shè)時(shí),應(yīng)有地橫桿和斜撐,以保證加工棚的穩(wěn)定性。
The reinforcement processing shed is a site for straightening, bending, welding and other reinforcement processing operations on the construction site. The length and width of the reinforcement processing shed are generally determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6 * 12M, 9 * 12M, 18 * 30m and so on. The length and width can be designed according to the actual construction situation. The layout of the worktable of the reinforcement processing shed shall also be reasonable. According to the real reinforcement processing process, as well as the storage of raw materials and finished products before processing, the ground of the reinforcement processing shed shall be 30cm higher than the ground of the construction site to prevent rainwater immersion. When erecting with scaffold pipes, there shall be ground cross bars and diagonal braces to ensure the stability of the processing shed.
2、工地鋼筋加工棚搭建細(xì)節(jié):
2. Construction details of reinforcement processing shed on site:
埃歐哲鋼筋加工棚采用國際標(biāo)準(zhǔn)鋼材制作,在現(xiàn)場(chǎng)利用扣件將多根鋼管扣接搭設(shè)成加工棚的整體式鋼結(jié)構(gòu),再設(shè)置斜撐和雙層防砸結(jié)構(gòu),校驗(yàn)鋼結(jié)構(gòu)強(qiáng)度是否符合設(shè)計(jì)要求,在欄桿上鉤掛標(biāo)語橫幅,整個(gè)鋼筋加工棚施工完畢標(biāo)準(zhǔn)化設(shè)計(jì)。全拼裝式,快速組裝,拆卸簡(jiǎn)單,方便運(yùn)輸,型材及配件規(guī)格可按需求來定制。同時(shí)地面也需要硬化,立柱基礎(chǔ)澆筑700*700*700mm混凝土,預(yù)埋300*300*12mm鋼板。
The eozhe reinforcement processing shed is made of international standard steel. Firstly, multiple steel pipes are buckled and erected on site to form an integral steel structure of the processing shed, and then diagonal bracing and double-layer anti smashing structure are set to verify whether the strength of the steel structure meets the design requirements. Safety slogans and banners are hung on the railings. The construction of the whole reinforcement processing shed is completed and standardized. Full assembly, quick assembly, simple disassembly and convenient transportation. The specifications of profiles and accessories can be customized according to demand. At the same time, the ground also needs to be hardened. The column foundation is poured with 700 * 700 * 700mm concrete and embedded with 300 * 300 * 12mm steel plate.
木工加工棚
3、工地鋼筋加工棚需注意事項(xiàng):
3. Precautions for site reinforcement processing shed:
1.一般情況下,鋼筋加工棚都在塔吊的吊運(yùn)范圍內(nèi),否則鋼筋吊動(dòng)不方便,同時(shí)必須設(shè)置雙層硬質(zhì)防護(hù),棚的具體尺寸要根據(jù)實(shí)際情況來定。
1. Generally, the reinforcement processing shed is within the lifting range of the tower crane, otherwise it is inconvenient to lift the reinforcement. At the same time, double-layer hard protection must be set, and the specific size of the shed shall be determined according to the actual situation.
2.防護(hù)棚的頂有二層的,上面的隔層上鋪模板,下面一層鋪二層竹芭片子,二層之間間距500 mm。
2. If there are two layers on the top of the protective shed, the upper compartment is paved with formwork, and the lower layer is paved with two layers of bamboo sheets, with a spacing of 500 mm between the two layers.
3.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌和宣傳用語的橫幅,圖牌的尺寸為:寬×高=2000mm×1000mm,橫幅寬度宜為1m。
3. The tool type reinforcement processing shed shall hang the operation specification drawing board and the banner of safety publicity language at an eye-catching place. The size of the drawing board is: width × Height = 2000mm × 1000mm, and the banner width should be 1m.
4.加工車間地面需硬化,宜選用砼地面。
4. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
5.內(nèi)部有滅火器、鋼筋加工設(shè)備、有照明系統(tǒng)
5. There are fire extinguishers, reinforcement processing equipment and lighting system inside
6.加工車間地面需硬化,宜選用砼地面。
6. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
7. 南方地區(qū),如遇臺(tái)風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。
7. In case of typhoon in southern China, windproof measures shall be taken, and wind ropes can be set.
感謝您的閱讀,此文的文章來源:木工加工棚更多的內(nèi)容和問題請(qǐng)點(diǎn)擊:http://www.perthama.com我們會(huì)繼續(xù)努力的為您提供服務(wù),感謝您的支持!
Thank you for reading. The source of this article is woodworking shed. For more information and questions, please click: http://www.perthama.com We will continue to work hard to provide you with services. Thank you for your support!

美国式禁忌完整版1一4| 日本无码精油按摩WWW视频| 激情国产一区二区三区四区小说| 老师带到宿舍做了一次| 日韩精品一区二区三区色欲av| 色-情-伦-理一区二区三区| 上课忘穿内裤被老师摸到高潮| 亚洲一区二区嗯好爽快点| 杂交bucsm人类ssba| 成人免费777777| 老师穿着旗袍肉色丝袜让我玩| 绅士库全彩爆乳漫画无遮拦| 欧美大尺寸suv欧美| 亚洲欧美精品午睡沙发| 日韩AV高清无码| 边做奶水边喷H高H共妻| 日韩av高清在线观看| 教授好大含不住了h| 国产欧美精品一区二区三区四区| 粗暴调教玩弄NP高H小说| 在c用力把桌腿a抬离地面时小说| 口述他用舌头给我添高潮| 国内少妇毛片视频| 放荡娇妻张开腿任人玩H| 公交车上~嗯啊被高潮| 13小男生gay自慰脱裤子| 久久AV无码精品人妻出轨| 性──交──性──乱| 97久久精品人人澡人人爽| 国产做A爰片久久毛片A片软件| 国产无遮挡A片又黄又爽网站 | 被老头疯狂灌浆怀孕小说| 精品久久久久久久免费人妻| 亚洲中文字幕无码久久2020| 少妇一夜三次一区二区| 激情五月综合色婷婷一区二区| 人妻精品久久久久中文字幕69| 国产成人无码18禁午夜福利P| 亚洲精品区无码欧美日韩| 西西大胆国模人体艺| 亚洲熟妇少妇任你躁在线观看 |